Bristol · RIBA Chartered Practice

Ashby Fenn Architects

Architecture model

A RIBA Chartered practice in Bristol, working in residential, education and adaptive reuse.

Work

Selected projects.

Residential, education and adaptive reuse, numbered in the order they were opened.

  1. 01

    021 / Sion Hill House

    A single-storey rear extension and full internal reconfiguration of a Georgian terrace in Clifton.

    • Type: Residential extension & alteration
    • Location: Clifton, Bristol, BS8
    • GIA: 78 m² (extension)
  2. 02

    024 / Paintworks Studio Fit-Out

    Reuse of a former paint factory floor as open-plan studio space for a design agency.

    • Type: Commercial fit-out, light industrial reuse
    • Location: Arnos Vale, Bristol, BS4
    • GIA: 210 m²
  3. 03

    019 / Northgate Mews

    Three new-build terraced houses on a backland infill site, currently on site.

    • Type: New-build residential, 3 units
    • Location: Bedminster, Bristol, BS3
    • GIA: 340 m²
  4. 04

    026 / Redcliffe Wharf Apartments

    Conversion of a disused bonded warehouse into twelve apartments, planning submitted.

    • Type: Warehouse conversion, 12 apartments
    • Location: Redcliffe, Bristol, BS1
    • GIA: 980 m²
  5. 05

    016 / Ashton Vale Primary Extension

    A two-classroom extension and covered play area for a local authority primary school.

    • Type: Education, new-build classroom block
    • Location: Ashton, Bristol, BS3
    • GIA: 260 m²
  6. 06

    028 / Stokes Croft Live/Work Units

    Conversion of a former print works into six live/work units, at concept design.

    • Type: Mixed-use conversion, 6 units
    • Location: Stokes Croft, Bristol, BS1
    • GIA: 420 m²

The practice

In figures.

Years trading
15
m² delivered
14,200+
Planning approval rate
92%

How we work

Four commitments.

  1. 01

    RIBA Chartered Practice

  2. 02

    ARB-registered architects throughout

  3. 03

    Named project architect, appointment to handover

  4. 04

    £5m professional indemnity cover, per project

RIBA Plan of Work

Where each project stands.

Stages 0 to 7, with every project pinned at the stage it has reached today.

  1. 0

    Strategic Definition

    • None
  2. 1

    Preparation and Briefing

    • None
  3. 2

    Concept Design

  4. 3

    Spatial Coordination

  5. 4

    Technical Design

    • None
  6. 5

    Manufacturing and Construction

  7. 6

    Handover

  8. 7

    Use

    • None

Photography

From site.

  • Architectural blueprint
    01021 / Sion Hill House, rear elevationClifton, BS8, 2024.
  • Construction site drone
    02024 / Paintworks Studio, trusses retainedArnos Vale, BS4, 2025.
  • Architecture model
    03019 / Northgate Mews, model, north lightBedminster, BS3, on site 2026.
  • Architect studio drawing
    04026 / Redcliffe Wharf, street elevation retainedRedcliffe, BS1, planning 2026.
  • Modern building facade
    05016 / Ashton Vale Primary, covered play areaAshton, BS3, 2023.
  • Architectural blueprint
    06013 / Leigh Woods House, south elevationLeigh Woods, BS8, 2022.

Practice

Questions

Do you take on small residential projects?

Yes, extensions and alterations make up roughly a third of current work, alongside larger new-build and conversion projects.

How are fees structured?

Fixed fee per RIBA stage for smaller projects; a percentage of construction cost for larger ones, agreed in writing before Stage 1 begins.

Can you take on a project already through planning?

Yes, though we'll review the existing consent and drawings at Stage 4 before agreeing to carry it forward under our name.

Do you act as Principal Designer under CDM?

Yes, on request, for projects notifiable under the Construction (Design and Management) Regulations 2015.

Who will actually run my project?

One of the three named architects listed on our credentials page, confirmed at appointment and unchanged through to handover.

Appointment

Every project starts as a model

Fixed fee per RIBA stage for smaller projects; a percentage of construction cost for larger ones, agreed in writing before Stage 1 begins.