Brackenmoor Energy, Hull
How we deliver contract to monthly report.
From site review to ongoing reporting, how Brackenmoor Energy delivers offshore wind and BESS O&M contracts.

Five steps
From first review to monthly report
- 01
Site & asset review
We assess the asset, existing contracts and grid connection status before proposing a scope.
- 02
Contract & availability target
An O&M or grid-connection contract is agreed with a stated availability guarantee, not a call-out schedule.
- 03
Mobilisation
Technicians, vessels or site access are mobilised, with CDM principal contractor duties allocated as needed.
- 04
Ongoing delivery
Scheduled and reactive maintenance runs against the contracted availability target, monitored continuously.
- 05
Reporting
Monthly performance, safety and availability reporting issued to the asset owner as standard, not on request.
Before you sign
Questions about delivery
How is your availability guarantee actually measured and enforced?
Availability is calculated monthly against the contracted target using SCADA data from the asset itself, not our own reporting, and the contract sets out service credits payable if the target is missed for reasons within our control.
Do your technicians hold offshore survival certification?
Yes, every technician deployed offshore holds OPITO BOSIET (or the equivalent Further Offshore Emergency Training) and MIST, alongside GWO Basic Safety and Basic Technical Training, renewed on the required cycle.
Can you take over an O&M contract mid-term from another provider?
Yes, this is a large share of our new business. We run a structured handover including asset condition survey, outstanding warranty claims and grid connection documentation review before taking on the contract.
What happens if a fault occurs outside a scheduled maintenance window?
Reactive response is included in the availability-based contract, not billed separately as an emergency call-out, response times are set out per asset type in the contract.
Do you handle the Ofgem accreditation and metering side of ROC or SEG payments?
We support the metering and reporting obligations that keep an existing accreditation current; the accreditation itself sits with the asset owner, and we work directly with Ofgem's requirements on their behalf where instructed.