
Offshore wind and battery storage · Hull
Offshore wind and storage kept generating
GWO-certified technicians, MCS and NICEIC-approved contracting and a published safety record, across the Humber and southern North Sea.


- GWO Basic Safety & Basic Technical Training certified team
- MCS certified, NICEIC approved contractor
- ISO 45001 certified, published safety record
- Availability-based contracts, not call-out billing
How we are measured
Availability, not activity, is what we're measured on
The connection, end to end
96.8%
340+
62
0.4
Brackenmoor Energy was founded in 2014 by a team of turbine technicians who felt the O&M contracts they were working under measured the wrong thing, hours on site rather than turbines actually generating. Every contract we write is structured around an availability guarantee, not a call-out schedule.
We operate from Green Port Way on the Humber, servicing offshore wind assets in the southern North Sea and East Anglia, and grid-scale battery energy storage systems (BESS) onshore across Yorkshire and the East Midlands. Our technicians hold GWO Basic Safety and Basic Technical Training as standard, with IRATA rope-access and OPITO offshore survival certification held across the operational team.
Principal contractor
We're a principal contractor under CDM 2015 for the projects we lead, and every DNO grid connection we work on is completed and commissioned to G98 or G99 as applicable, with the paperwork issued before energisation, not after.
What we operate
Seven services, one line
Offshore wind O&M, BESS operations, grid connection commissioning and CDM principal contractor services from Brackenmoor Energy, Hull.
- 01Offshore Wind O&MScheduled and reactive maintenance for offshore wind turbines, delivered by GWO and OPITO-certified technicians. £4,200

- 02BESS Operations & MaintenanceOperations and maintenance for grid-scale battery energy storage systems, from commissioning through asset life. £3,100

- 03Grid Connection & CommissioningG98 and G99 grid connection applications, DNO liaison and commissioning for wind and storage assets. £8,500

- 04High-Voltage Cable & Array WorkInspection, fault-finding and repair on array cable and substation infrastructure connecting turbines to the grid. £950

Our promise
Four things we put in writing
GWO Basic Safety & Basic Technical Training certified team
MCS certified, NICEIC approved contractor
ISO 45001 certified, published safety record
Availability-based contracts, not call-out billing




On site
Turbines, storage and the people between

01Turbine transfer, southern North SeaA technician transfer to a turbine platform via crew transfer vessel. 
02BESS site, East RidingGrid-scale battery storage units under Brackenmoor O&M contract. 
03Green Port Way control roomThe operations control room coordinating offshore logistics. 
04Team at Green Port WayGWO-certified technicians ahead of a scheduled offshore rotation.
Asset owners
What asset owners say
Every O&M provider we spoke to quoted a visit schedule. Brackenmoor quoted an availability guarantee and then hit it, quarter after quarter.
They took over our BESS O&M after our previous contractor missed two G99 compliance deadlines. No issues since, and the monthly reporting is genuinely useful.
As an independent asset owner without our own technical team, having Brackenmoor act as owner's engineer separately from the O&M contractor gave us confidence we weren't marking our own homework.
The condition monitoring flagged a developing gearbox fault three weeks before it would have caused an unplanned outage. That alone paid for the contract.
Start with the asset
Tell us what you operate
GWO-certified technicians, MCS and NICEIC-approved contracting and a published safety record, across the Humber and southern North Sea.
- Green Port Way, Hull, HU9 1TQ
- Mon–Thu 07:30–17:30Fri 07:30–17:00Sat–Sun Closed